Lititz Borough: Section 608.Stormwater Management and Floodplain Controls
top
bottom left
Advanced Search
bottom right

View sub-linksAdministration
Annual Drinking Water Quality Report
Application Forms
View sub-linksBorough Information
Code of the Borough of Lititz
Composting
View sub-linksEmergency Services
Fee Schedule
Helpful links
View sub-linksLititz-Warwick Joint Strategic Plan
View sub-linksLocal Services Tax Forms
Parks & Recreation
Pension Contractors Disclosure
View sub-linksPolice Department
View sub-linksPublic Works Department
Recycling Tips
Residential Rental Inspection Ordinance
Right To Know Forms
Subdivision & Land Development Ordinance
Trash Collection Schedule
View sub-linksZoning Ordinance
Go to: LititzPA.com
2013 Municipal Calendar
 View as Text-Only
Home
Log in Register

Receive notification of changes to our site.
Sign up

Article VI: Design Standards

Section 608.Stormwater Management and Floodplain Controls

SECTION 608. Stormwater Management and Floodplain Controls. All storm water management, collection, conveyance, soil erosion control, and floodplain considerations shall be accomplished in accordance with the provisions of the Borough Storm Water Management Ordinance, as amended:

A. Floodplain areas shall be established and preserved as provided by the Borough Zoning Ordinance.

B. Whenever a floodplain is located within or along a lot, the plan shall include the boundary of the floodplain and the elevation or locational dimensions from the centerline of the watercourse; a plan note that the floodplain shall be kept free of structures, fill and other encroachments; and a plan note that floor elevations for all structures adjacent to the floodplain shall be two (2) foot above the one hundred (100) year flood elevation.





Content Last Modified on 7/31/2012 11:43:14 AM

7 South Broad Street
Lititz, PA  17543
Phone: (717) 626-2044
Fax:  (717) 626-1329
POLICE: (717) 664-1180
POLICE Admin. (7am to 6pm, Mon thru Fri): (717) 626-6393
Emergency:  911